Hey everyone(:
It has been a while, but like Sam said, things are moving SO fast at camp!
The pool is almost finished. They are putting the final coating on the pool this week so they can fill it up with water. Hopefully it will be filled by Earth Day(:
Speaking of Earth Day, have you signed up?(:
We've chosen what the colors will be inside the pool; it will be white with blue specs. The bathroom floors, toilets, and sinks for all of the sites went in on Thursday and Friday.
WE HAVE POWER !!! :D The light poles for the walking trails are going in this week. Also we are using a recycled asphalt product made up of different materials on all of the main roads going through camp.
Like Samantha and I have said a lottttt lately, things are moving SOSOSO fast at camp. Soon it will be open for you guys to make your own memories(:
More coming soon,
Kaylee (:
Well I hope to see you at Earth Day(:
Girl Scouts of Gateway Council, Inc. 1000 Shearer St. Jacksonville, FL 32205 www.girlscouts-gateway.org
Showing posts with label recycling. Show all posts
Showing posts with label recycling. Show all posts
Wednesday, April 7, 2010
Monday, July 27, 2009
The Concrete Is Here!
If you were anywhere near Long Bay Rd & Blanding Blvd Friday you would have seen the convoy of concrete trucks heading in and out of North Fork. The trucks were on site bright and early Friday morning to begin pumping concrete into the pool - and we were there!
The concrete truck hooks up to this huge crane type truck that pumps the concrete through a hose into the pool.Each truck holds 10 yards of concrete and it took about 11 trucks just to pour the floor!
As the concrete is pumped into the pool, workers spread it to get out air bubbles and make sure it is evenly spread.Everyone has to work quick; from the time the truck is filled they only have 90 minutes to get to the camp and get it pumped and spread before the concrete starts to harden. It is a long day and a lot of hard work!
When a truck is empty it has to go to the concrete washout area to clean out any unused concrete.
If they don't the concrete will harden in the holding tank and it would to be chipped out by hand - UGH! The unused concrete is washed out into a bin and is later recycled and reused in roadway projects.
This is the biggest transformation the pool has taken and it is really fascinating watching and learning about what it takes to get from dirt to water. More to come next time.
Subscribe to:
Posts (Atom)
